ACT MISSING MIDDLE HOUSING REFORMS

The ACT just changed the rules on your block.

Since 1 July 2026, most Canberra homes can add a second dwelling. A granny flat for family, a rental for income, or a separate title you can sell one day. The old 120m² cap is gone. See what your block can do in two minutes.

THE MISSING MIDDLE HOUSING REFORMS

What actually changed in July 2026.

For years, adding a second home to a suburban Canberra block was slow, costly and far from certain. The ACT Government's Missing Middle Housing reforms changed that. Thousands of standard suburban blocks can now take a second dwelling, with fewer restrictions and a shorter path to approval.

A second dwelling is now an entitlement, not a special case.

BEFORE

Adding one meant a lease variation assessed case by case, with no guarantee it would be approved.

NOW

Every single-dwelling block in the RZ1 and RZ2 zones, which covers most of suburban Canberra, now has an automatic entitlement to a granny flat. A titled, separately-sellable second home still has its own approval path, but it's no longer the exception it used to be.

THE 120m2 SIZE CAP IS GONE

BEFORE

A second dwelling being unit titled for separate sale could be no larger than 120m².

NOW

That cap on a titled second home is gone - size is now set by site coverage (up to 45% in RZ1), not a fixed number. A granny flat keeps its own separate 90m² limit, unchanged.

THE LEASE VARIATION CHARGE JUST GOT A LOT CHEAPER

BEFORE

You paid the full lease variation charge upfront, on top of a lengthy assessment, just to change your block's purpose clause.

NOW

That lease variation is now exempt development, assessed in about 10 working days instead of 60. Eligible blocks also get a 50% reduction on the charge, deferred until construction is finished - available for developments approved before 30 June 2029 and completed by 31 December 2030.

BIGGER BLOCKS CAN BE SPLIT INTO SEPARATE TITLES

BEFORE

Subdividing a suburban block so each home had its own title was rarely possible.

NOW

Blocks of 600m² or more can be unit titled (strata), so the second home has its own title and can be sold or financed on its own.

WHO IS THIS FOR

You have probably thought of this before.

Most people we talk to have had an idea like one of these sitting in the back of their mind for years. The reforms are what make it realistic now.

  • Your parents want to stay close and independent, but moving into the main house is not the answer.

  • Your adult kids cannot get a foothold in the Canberra market.

  • A second income would take pressure off the mortgage.

  • You have a big backyard that does nothing but cost you to maintain.

  • You looked into subdividing years ago and were told your block was too small or the process was too hard.

  • You are planning to sell in the next few years and want to add genuine value first.

WHAT CAN YOU BUILD

Two Paths: Granny Flat vs Secondary Dwelling

Once you know a second dwelling is possible, the next question is what kind. There are two paths, and which one fits comes down mostly to how big your block is.

GRANNY FLATS

A self-contained home for family or extra income, without leaving your title.

  • Minimum block size: None.

  • Maximum size: 90m²

  • Title: Stays on your existing title

  • Can it be sold separately: No

  • Best for: Family, a home office, or rental income

  • Approval path: No subdivision required

SECONDARY DWELLINGS

A fully independent second home you can title and sell on its own.

  • Minimum block size: 600m²

  • Maximum size: Limited by site coverage, up to 45% in RZ1

  • Title: Can be strata titled, its own title

  • Can it be sold separately: Yes

  • Best for: Unlocking equity or building to sell

  • Approval path: Involves subdivision or unit titling

Not sure which one fits your block? Take the two-minute check.

YOUR TWO-MINUTE CHECK

See what your block can do.

A handful of quick questions about your block, then a straight answer on what's likely possible, right here on the page.

Think house, garage, shed and driveway combined.
Almost there! Pop in your details below and you'll see your result straight away, right here on this page, no waiting on an email.
By submitting this form, you consent to Exceed Homes contacting you about your enquiry. See our Privacy Policy for how we handle your information.

The Exceed Homes 3D Build Approach

Start to finish
The whole journey, at a glance. Click any stage for the details.
Concept plan (now with a 3D render) 50% off until 31 December — $1,750 inc GST (normally $3,500)
Explore first, commit later
Free Consultation & Site Visit
No jargon — we work in plain language to understand your building outcomes, so you know exactly what will be delivered.
$1,750 inc GST
Concept Plan & Project Estimate
A real architectural concept designed around your block — not a template — now including a digital 3D render. 50% off for granny flat & small home concept plans until 31 December (normally $3,500).
Review & Refine
Sign Contract
Preconstruction Design Phase Begins
A dedicated Project Manager and our full 3D Build Approach, from here.
Your build begins — full support from here
Design Begins
Concept Approved
Selections + Interior
Meet Your Designer
Visit Trusted Suppliers
Confirm Selections
Architecture + Technical
Site + Soil Assessments
Working Drawings Prepared
Compliance + Certification

Know exactly what you want, or need ideas? Either way, we shape it together.

You’ll never face this list alone — we manage every requirement for you.

~2–3 months
Building Approval
Approved. Ready to build.
Run by a dedicated Project Manager and Site Lead, every phase
Project Kick-Off
Site Preparation + Foundations
Frames, Trusses + Structure
Live photos and progress updates in Buildertrend, any time you check.
Lock-Up
Roof, windows and external doors on — weathertight.
Rough-In
Plumbing, electrical and home automation roughed in.
Fit-Out + Fix-Out
Custom joinery, vanities and benchtops; painting, tiling, flooring, light fittings, tapware & appliances.
~3–24 months
Practical Completion & Handover
Defect + Warranty Period
6-year structural, 2-year non-structural — we stand behind the work.
Built to last. Backed for years to come.

In Partnership With

LogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogoLogo

About Us

We do things a little differently.

The Journey with Exceed Homes starts with our understanding of our client’s desired outcomes and expectations. This underpins our 3D Building strategy that forms the consultative building process we use for every Exceed Homes project.

Exceed Homes go the extra mile to provide transparency and information in order for you to make an informed decision based on choice and realistic cost regarding your project.

We have developed in conjunction with our strategic partners, an extensive portfolio of products, professionals and processes. This has proven to be effective in enabling streamlined delivery, quality information and value-add for every project we undertake.

Have Questions ?

Frequently Asked Questions

Here's what we usually get asked

Am I actually eligible, or is the quiz just a guess?

The two-minute check gives you a genuine read based on your block size and how much of it's already built on, the two things that actually decide this under the reforms. It's not a placeholder. That said, a proper DA still needs a surveyor and a real look at your site, so treat your result as a strong starting point, not a final answer.

What's the real difference between a granny flat and a secondary dwelling?

A granny flat stays on the same title as your main home, so it's simpler to build but can't be sold on its own. A secondary dwelling gets its own title through subdivision, so it can be sold or financed separately, but needs a bigger block and a longer approval path. Most people choose based on whether they ever want to sell or finance the second home independently.

Do I still need council approval?

Yes, for the building itself. The lease variation needed to add the dwelling is now exempt development, so it's assessed in around 10 working days instead of 60. But the design and siting of the actual home still needs a full DA. We manage that whole process for you, it's part of what happens in the Design phase above.

How long does the whole process take?

Roughly two to three months from concept to building approval, then anywhere from three months to two years to build, depending on the size and complexity of the project. You'll have a dedicated Project Manager and live updates in Buildertrend the whole way through.

What does it actually cost?

It depends on the size, finishes and site conditions, which is exactly why we don't quote per square metre, those numbers rarely hold up once your actual block and choices are factored in. The concept plan - including a digital 3D render - and a real project estimate costs $1,750 including GST while the current offer runs (normally $3,500), and that's where you get an honest number for your specific project.

What if my block is in NSW, not the ACT?

These reforms are ACT specific, so different rules apply just across the border in places like Queanbeyan or Googong. Book a call anyway, we build across both and can walk you through what's actually possible on your block.

TESTIMONIALS

What others are saying

Still have questions?

Let's talk about your block.

Prefer to skip the quiz and just talk it through? We're happy to help directly.

02 6255 9835 · [email protected]